S.No | Title | Client |
---|---|---|
1 |
Laboratory Geo-technical Investigation on rock core samples from PRLIS-PKG-I, |
M/s MEIL |
S.No | Title | Client |
---|---|---|
1 |
Engineering geiological investigation of the forebay,draft tubes, pressure mains,delivery mains and pump house area of Package -I and II of 1.10 TMC lift system of the Kaleshwaram project link-II,Telangana state. |
M/s. Irrigation & CAD Dept. |
2 |
Engineering geiological investigations of cut slopes for intake pool, upstream and downstream hillock above pressure tunnels and powerhouse area and tailrace pool of Indra Sagar Polavarm Hydro Electric Project ( 12 x 80 MW). East Godavari District, Andra |
M/s.WRD,Govt.of AP |
S.No | Title | Client |
---|---|---|
1 |
Support for extraction, grading and testing of armured rock at construction site at Vizag |
M/s. Navayuga Engineering Company Limited (NECL), Hyderabad |
S.No | Title | Client |
---|---|---|
1 |
Determination of in situ deformability and shear parameters of rock mass at the proposed Lower Kopili hydroelectric project, Assam |
M/s. L & T Construction |
S.No | Title | Client |
---|---|---|
1 |
3D Numerical modelling of power house complex & surge tank for Vishnugad Pipalkoti Hydroelectric project,Uttarakhand |
THDC India Ltd. |
S.No | Title | Client |
---|---|---|
1 |
Monitoring of Ground Vibration and Air Overpressure Due to blasting carried out for construction of Unit 5 and 6 at KNPP,Kudankulam. |
M/s L&T KKNPP |
2 |
Monitoring of blast induced vibration at two identified locations(Phase-III) Darlipalli Super Thermal Power Project(DSTPP),Stage-1(2*800MW),NTPC Odisha,Extention-VIII |
M/s NTPC Limited |
3 |
Ground vibration and air overpressure studies at Zuari limestone mine, Zuari |
M/s. Zuari Cement Limited ,BANGALORE |
4 |
Technical guidance on controlled blasting for excavation for the costruction of electrical substation building at HWPF near RAPP 3&4 structures and ground vibration measurement. |
NTPC Ltd. |
5 |
Extension of technical guidance services for excavation of various powerhouse complex components of Punatsangchhu-II (1020) Hydroelectric project by controlled blasting,Punatsangchhu-II (1020) Hydroelectric project authourty, (PHPA-II),Bhutan (Extension-2 |
Punatsangehhu-II Hydroeclectric Project Authority (PHPA-II) |
6 |
Technical guidance for grading and testing ofgraded materials to construct break water , Varsha Inner Harbour project - Visakhapatnam ,L&T Construction. |
L&T construction |
S.No | Title | Client |
---|---|---|
1 |
QA support for the On-going Geological/Geotechnical investigations at Mahi Banswara Rajasthan Atomic power project. |
Nuclear Power Corporation of India Ltd., |
S.No | Title | Client |
---|---|---|
1 |
NDT on vital components of Trollely system &wire rope at M/s.KPCL,Karnataka. |
KPCL |
2 |
NDT on Suspension gear parts & wire ropes at RD mine ,HZL |
HZL |
3 |
NDT on winch vital components &wire rope defectographs studies at Arulmigu Dhandayuthapani Swamy Thirukoil, Tamilnadu |
Arulmigu Dhandayuthapani Swamy Thirukoil, Tamilnadu |
4 |
NDT on Suspension gear parts & wire ropes at Zawar group of mines. |
HZL |
5 |
NDT Work on 45 Ton Capacity Crane vital components at Shiva geneerating station, M/s. KPCL |
M/s. KPCL |
6 |
NDT cable belt drive wire ropes at NALCO, Damanjodi, Odisha |
NALCO |
7 |
NDT on man winding systems (4 units) at SCCL |
SCCL |
8 |
NDT on suspension gear parts , winders part& wire rope defectograph studies at rajpura Dariba Mines |
HZL |
9 |
NDT on suspension gear parts&wire rope defectograph studies at Rajpura Dariba Mines,M/s.HZL,Rajasthan |
M/s. HZL,Rajasthan |
S.No | Title | Client |
---|---|---|
1 |
Engineering geiological investigations of Tunnel of J. Chokka Rao Godavari Lift Irrigation Scheme (JCR-GLIS) phase -III,package-III,Telangana State. |
M/s. Megha Engineering and Infrastructures Pvt Ltd., Hyderabad |
2 |
Engineering geological investigations of underground lift Packages-1,5,8 &16 Includes Tunnel between Packages 1 to 16 of Palamuru Ranga Reddy Lift Irrigation Scheme, Telangana State |
Irrigation of CAD Department, Government of Telangana |
3 |
Construction stage engineering geiological investigation of main tunnel, ventilation shaft and delivery mains of pump house complex area of Kaleshwaram Project-Link-III, Package -9, Malkapet, Rajanna Sircilla District, Telangana. |
M/s. Irrigation & CAD Dept. |
S.No | Title | Client |
---|---|---|
1 |
MASW survey and measurment of vibration parameters around tailing dam of Bailadila mines |
IIT Bombay |
2 |
Conducting of Cross hole (including deviation survey)at GHAVP, Fatehabad,Haryana. |
NPCIL |
3 |
Support for extraction, grading and testing of armured rock at construction site at Vizag |
M/s. Navayuga Engineering Company Limited (NECL), Hyderabad |
4 |
Carring out geophysical investigations in MRPL complex at Mangalore. |
MRPL |
5 |
GPR Survey to find the cause of instability of Spillway, Flip Bucket, and plunge pool slopes at NTPC Koldam |
NTPC Ltd. Koldam |
S.No | Title | Client |
---|---|---|
1 |
Stability monitoring of the powerhouse complex at tala Hydropower plant (THP) ,DGPC using Microseismic |
DGPC, Bhutan |
S.No | Title | Client |
---|---|---|
1 |
Determination of safe bearing capacity of underlying strata by Plate load test for the design of barrage at Punatsangchhu-I Hydroelectric project, Bhutan |
Druk Green Power Corporation Ltd (DGPC), Bhutan |
2 |
Determination of in-situ deformability modulus at Saundatti Pumped Storage Project (PSP) |
M/s.Greenko Group |
3 |
Determination of in-situ stress parameters at the proposed Underground powerhouse of |
WAPCOS Limited |
4 |
Determination of In-Situ stress parameters (Magnitude, Direction & Gradient) of the overlying roof strata for orientation of Longwall panel at Muraidih Colliery, Barora Area, BCCL, Dhanbad. |
BCCL, Dhanbad |
5 |
Determination of In-situ stress parameters for the design of stopes at Sindesar Khurd mine ,HZL,Rajasthan |
HZL |
6 |
Determination of In-situ deformability parameters by pressure meter method in soil –cement GI Mock-up area at Gorakhpur Haryana, Anu vidyut pariyojana,Haryana. |
NPCIL |
S.No | Title | Client |
---|---|---|
1 |
Scientific Study to ascertain the stability of the high wall of Granite Quarry of M/s Midwest Granite Pvt Ltd, Ongole, AP. |
M/s Midwest Granite Pvt Ltd, Ongole |
2 |
Scientific study for slope stabilization and monitoring of ground movement of South Face, Mine I of NLCIL, Neyveli, Tamil Nadu |
Neyveli Lignite Corporation India Limited, Tamil Nadu |
3 |
Scientific studies for stability assessment for pit slope and dump of Barsingapur lignite mine,Bikaner Rajasthan. |
Neyveli Lignite Corporation India Limited, Rajasthan |
4 |
Scientific Study for stability assessment and monitoring of Pit and Dump at 3 nos. Budgauna, Hinauti and Majhgawan Limestone mines at Sidhi Cement works |
UltraTech Cement Limited |
5 |
Scientific study on design of pit benches and stability assessment of the pit of Kalane Iron Ore Mine located in Sindhudurg, Maharashtra |
M/s. Minerals and Metals, Sindhudurg, Maharashtra. |
6 |
Technical guidance for scientific quarrying and suitable pit slope for the proposed dimensional stone black granite quarry of Stone Trust Enterprises, Semmedu, Villupuram District, Tamilnadu |
M/s. Stone Trust Enterprises |
7 |
Geotechnical investigations to ascertain the stability of slopes of Rock Quarry in the Sy.No. 184/1A, 184/1A2 located in Elappara Village, Peermade Taluk, Idukki District, Kerala State. |
M/s. Kizhakethalackel Rocks Quarry,Kerala. |
8 |
Scientific Study for assessment of safe pit slope angle and waste dump at Redi Iron Ore Mine of M/s. Minerals and Metals, Redi Village, Vengurla Taluka, Sindhudurg, Maharashtra |
M/s. Minerals and Metals |
9 |
Scientific studies to optimize the bench parameters and design of final pit stability of granite quarry of Shadahalli Building Stone Quarry leases Holders and Lorry owners association |
Shadahalli stone association |
10 |
Review of the effective implementation of recommendations on stability of High Wall of Pallava Granite Quarry and study on monitoring of pit stability |
Pallava Granite Industries (India) Pvt Ltd |
S.No | Title | Client |
---|---|---|
1 |
Analysis of Instrumentation Data at Dam Complex, Phunatsangchu-II Hydro Electric Project, Bhutan |
PHPA-II, Bhutan |
2 |
Geodetic monitoring of Sardar Sarovar Dam. |
Sardar Sarvar Narmada Nigam Ltd. |
3 |
Cap Rock Stability at Central Baroi Mine vis-a-vis Depillaring of Remnant Pillars – A Critical Appraisal |
Hindustan Zinc Ltd. |
4 |
Analysis of Geotechnical & Geodetic Instrumentation Data at C-3 Package of Punatsangchhu-II Hydroelectric Project, Bhutan (2020-21) |
PHPA-II, Bhutan |
5 |
Deformation Monitoring of Underground Powerhouse cavern of Sardar Sarovar Project |
Sardar Sarvar Narmada Nigam Ltd. |
6 |
Analysis of Instrumentation data of Desilting Chamber, h power house complex,surge shaft,TRT outfall area and Dam at NJHPS |
Satluj Jal Vidyt Nigam Ltd. |
7 |
Geodetic monitoring of Sardar Sarovar Dam. |
Sardar Sarvar Narmada Nigam Ltd. |
8 |
Analysis of Cavity Monitoring System Data for the Void above Downstream Surge Chamber at C-3 Package of Punatsangchhu-II Hydroelectric Project, Bhutan (2020-21) |
PHPA-II, Bhutan |
S.No | Title | Client |
---|---|---|
1 |
Optimisation of blast design for Mangampet Dolomite mine, APMDC Ltd., |
APMDC Ltd., |
2 |
Technical guidance for rock excavation by controlled blasting for site grading work at SMF plant site, Challakere, Chitradurga. |
BARC,Mysore |
3 |
Procedure for controlled blasting and monitoring of ground vibration for rock excavation at Kaiga 5&6 site, Kaiga |
NPCIL, Kaiga |
4 |
Monitoring of blast induced vibration at two identified locations (Phase-III), Darlipalli Super Thermal Power Project (DSTPP), Stage-I (2×800 MW), NTPC |
NTPC Ltd. |
5 |
Monitoring of Blast induced vibrations at two identified locations(Phase-III) Darlipalli Super Thermal Power Project(DSTPP).Stage -I.NTPC Limited.Odisha |
NTPC Ltd. |
6 |
Phase II Extension 4,Monitoring of ground vibration and air overpressure due to blasting carried out for construction of Hydro-Technical Structure of unit 3 and 4 at Kudankulam Nuclear Power Plant, Kudankulam, L&T, Tamil Nadu. |
L&T,&ECC-KKNNP,P-2,HTS Package |
7 |
Technical Guidance for excavation of various components of Power House Complex, Puntsangchhu II , Hydroelectric Project, Bhutan, (Extension-1) |
Punatsangehhu-II Hydroeclectric Project Authority (PHPA-II) |
S.No | Title | Client |
---|---|---|
01 | NDT on vital components of winders at Zawar group of mines | HZL |
02 | NDT on cable belt drive wire ropeway, Shimla at NALCO, Damanjodi, Odisha | NALCo, Damanjodi |
03 | Structure stability audit of head gears at GDK-10 incline, 21 Incline yellandu, VK-7 Incline and PVK-5 Incline | SCCL |
04 | Structure stability of HEMM's -Kirundul Complex, NMDC | NMDC Ltd |
05 | NDT on vital components of Winders at Zawar group of mines, HZL | HZL, Zawar Mines, Rajasthan |
06 | NDT on vital components of winders at RD mines, HZL | HZL |
07 | Testing Rock Samples from Maheswari Mining Limited, KGF | Maheswari Mining Ltd. |
08 | Laboratory geo-technical investigations on well bore rock core samples from Gamij Field, Sadra Field, Sri Field of CEWEll) ,ONGC, Barodra. | ONGC |
09 | Laboratory geo-technical investigations on Rock Samples of Arun-3 HEP, SAPDC, Nepal | SAPDC, Nepal |
S.No | Title | Client |
---|---|---|
01 | Engineering geiological investigations for cut slopes ( intake pool, upstream and downstream hillock above tunnels) powerhouse area and tailrace pool of Indra Sagar Polavarm Hydro Electric Project ( 12 x 80 MW). West Godavari District, Andra Pradesh | M/s. APGENCO, Govt. of A.P |
02 | Macro Landslide hazard Zonation mapping of Kaiga hole catchments Kaiga Nuclear Power Pruoject site | M/s. NPCIL |
03 | Construction Stage Engineering Geological Mapping of the foundation floor of onsite Emergency Support Center of Kakrapar Atomic Power Project Unit III and IV, Gujarat | M H Khanusiya |
S.No | Title | Client |
---|---|---|
01 | Support for extraction, grading and testing of armured rock at construction site at Vizag | M/s. Navayuga Engineering Company Limited (NECL), Hyderabad |
02 | Geophysical suvey for mapping rockmass condtiondtion and isolated boulders at the two station box location of Bangloare Metro Rail Project, Phase-II | L & T Construction, Bangalore |
03 | Geophysical studies to investigate the strata conditions around the tailing dam site at Muri,Ranchi | Hindalco Industries Ltd. |
04 | Studies of vibration impact analysis on underground 36" SBHT gas pipe line of ONGC passing through premises of Surat airport | ONGC Ltd. |
05 | Geophysical survey using resistivity imaging and cross hole GPR tomography to detect the path of water seepage into the underground metrostation box at marol naka in Mumbai | L&T,Mumbai |
S.No | Title | Client |
---|---|---|
01 | Stability monitoring of power house cavern and transformer hall at THP, DCPC using Microseismics | DGPC, Bhutan |
S.No | Title | Client |
---|---|---|
01 | Determination of in situ rock mechanics parameters at the proposed Arun-3 H.E.Project | SJVN, Nepal |
02 | Determination of safe bearing capacity of soil by plate load tests at upstream coffer dam and switch yard of Arun-3 H E Project Nepal | SJVN, Nepal |
S.No | Title | Client |
---|---|---|
01 | Scientific Study for design of slopes and stability assessment of Dolomite Project at Mangampet, APMDC, Andra Pradesh | APMDC Ltd |
02 | Scientific studies to optimize the bench parameter & design of final pit slope stability of Sy. No. 265/1,2,3A,3B,4,5,264/1,2 etc of M/S ACFA Estates | ACFA |
S.No | Title | Client |
---|---|---|
01 | Audit of Ground Control Management Plan of Zawar group of Mines | HZL |
02 | Geodetic monitoring of SardarSarovar Dam | SSNNL |
03 | 3D Numerical model studies for stress analysis of underground power house complex & surge shaft of Arun 3 Hydroelectric project, Nepal | SJVNL |
04 | Development of instrumentation network for C#3 package of punatsangchhu-II hydroelectric Project, Bhutan. | PHPA-II |
05 | Deformation monitoring of U/G powerhouse cavern of Sardar Sarovar project | SSNNL |
06 | Analysis of Instrumentaion data and assistance in iInstallation and monitoring of Instruments at C#3 Package of punatsangchhu-II hydroelectric Project, Bhutan(2018-19) | PHPA-II |
07 | Review and determination of alarming limits for surface subsidence through numerical modelling at Rajpura Dariba Mines, HZL, Rajasthan | Hindustan Zinc Ltd. |
08 | Scientific Studies for Evaluation of Stope and Pillar Stability vis-à-vis Stope Sequencing through Numerical Modelling at Barol Mine, HZL., Rajasthan | Hindustan Zinc Ltd. |
09 | Networking and Analysis of Instrumentation Data at Dam Complex, Punatsangchhu-II Hydroelectric Project, Bhutan | PHPA-II, Bhutan |
10 | Analysis of instrumentation data and guidance for installation and monitoring of instruments at C#3 package of Punatsangchhu-II Hydroelectric Project, Bhutan | PHPA-II |
11 | 3D Numerical Analysis of Machine Hall Cavern for Tehri PSP with change in geotechnical properties and support system, Uttarakhand. | THDC India Ltd. |
S.No | Title | Client |
---|---|---|
01 | To suggest suitable controlled blast designs for various excavations and monitoring of blast vibration for peruvannamuzhi SHEP (6 MVV), Kozhikode, KSEB | The Chief Engineer (CC) North, Kozhikode, KSEB |
02 | Blast design for armour rock to construct break water for varsha project - visakhapatnam navayuga engineering company ltd | NECL |
03 | Technical guidance for controlled blasting and monitoring of blast vibration for excavating various components at Pazhassi sajar SHE project, Kozhikode | KSEB Ltd |
04 | To suggest suitable design for excavations of power house at polavaram irrigation project, A.P. | Thriveni Earthmovers Pvt.Ltd. |
05 | Study on impact of Ground Vibration due to Sub level Open Stope Blasting at Hira Buddini Satellite Underground Gold Mine on surface structures, Hutti Gold Mines Ltd., Hutti, Raichur, Karnataka | HGML |
06 | Technical Guidance for Controlled Blasting for Different Excavation Components of Power House Complex, Puntsangchhu II (1200MW ) Hydroelectric Project, Bhutan, WAPCOS Limited, Gurgaon | WAPCOS Ltd. Bhutan |
07 | Controlled blast design for the construction of Terminal Building at Chennai Airport near critical structures ,L&T construction(Building and constructions), Chennai. | L&T construction |
08 | Phase II Extension 3,Monitoring of ground vibration and air overpressure due to blasting carried out for construction of Hydro-Technical Structure of unit 3 and 4 at Kudankulam Nuclear Power Plant, Kudankulam, L&T, Tamil Nadu. | L&T, KKNNP,P-2,HTS Package |
09 | Ground vibrations and air overpressure studies at quarries located at survey No,253,Nemakal Village,Bommanahalli Mandal,Anathpuramu District,Andhra pradesh. | AP Mines and Geology |
S.No | Title | Client |
---|---|---|
01 | Geological/Geotechnical support for the studies carried ut at Kaiga Nuclear Power Plant, for Unit 5 & 6, Kaiga, Karnataka | Nuclear Power Corporation of India Ltd., (NPCIL), Kaiga, Karnataka |
02 | Seismotectonic evaluation (Feasibility study) for additional NPP sitesin Nellore and Prakasam districts, A.P. | Nuclear Power Corporation of India Ltd., (NPCIL) |
S.No | Title | Client |
---|---|---|
01 | Stability test of Heavy Earth Moving Equipment and Proof Load test &NDT test of Cranes at BIOM,Bacheli Complex | NMDC Ltd. |
02 | NDT of 11 winders and suspension gearparts at HGML,Raichur | HGML |
03 | NDT on vital components of south ventilation shaft, RampuraAgucha Mines, HZL | SSML |
04 | NDT on Cable belt drine wire ropes at NALCO, damonjodi Odisha ,visit 2 of 6 | NALCO |
05 | NDT on Vital parts of the winder at Khetri & Kolihan Mines HCL | HCL |
06 | NDT on vital components of winders at RD mines,HZL | HZL |
07 | Non-destructive Testing on Vital components of Winders at Zawar Group of Mines, HZL | HZL |
08 | In-Situ non-destructive testing of winch vital components, bogie attachments and wire ropes | ADST |
09 | NDT on vital components of winders at RD mines,HZL | HZL |
10 | Laboratory geo-technical investigations on well bore rock core samples from Gamij Field, Khubal Field, Sri Field & Linch Field of CEWEll) ,ONGC | ONGC |
11 | Testing Granite Samples from Archena Industries Private Limited, West Bengal. | Archena Industries Pvt. Ltd. |
S.No | Title | Client |
---|---|---|
01 | Engineering geological investigations of the cave area of shri Mata Vaisno Deviji, Reasi District of Jammu and Kashmir | SMVDSB |
02 | Engineering geological foundation mapping of surge pool, transformer cavern and pump house cavities and geological investigations for draft tubes, bus duct, deliver main shafts and ventilation shafts of Kaleshwarm Lift irrigation project Package-12, Siddi | MEIL |
03 | Engineering Geological Foundation mapping of surge pool and pump house cavities and geological investigations for deliver main shafts(horizantal & Vertical) and Ventilation shafts of Kaleshwaram LIS-p11 | MEIL-SEW-ABB |
04 | Engineering geiological investigations of pump house complex area of J.Chokka Rao Devadula Lift Irrigation Scheme ( JCR - KLIS)/J.Chokka Rao Godavari Lift Irrigation Scheme ( JCR - GLIS) phase - III, package - III, Warangal District, Telangana | MEIL |
S.No | Title | Client |
---|---|---|
01 | Geophysical Survey for mapping Sub Surface Strata for rock mass classification - Phase II | Karle InfrPvt.Ltd. |
02 | Geophysical survey to assertain the risk of subsidence of 10 CL pipe line form (Ch 257.700 to 258.450) & 244.800 to 245.800 | IOCL |
03 | Geophysical investigation for mapping hard rock profile at the site of Karle Exports in Yeshwanthpur, Bangalore | Karle Exports Pvt. Ltd. |
S.No | Title | Client |
---|---|---|
01 | Stability monitoring of power hose cavern of Tala hydro power plant using Microseismics | DGPCL, Bhutan |
S.No | Title | Client |
---|---|---|
01 | Determination of In-situ Stress tensor at the proposed underground pump house drift of Devsari H.E.P. | SJVNL |
02 | Determination of In-situ sheare parameters at the proposed water dam locations at Chasnalla Underground mine ,Jharkhand | SAIL |
03 | Determination of In-situ Stress regimes at the Downstrem Surge Gallery,PHEP-II | PHEP-II, Bhutan |
04 | Determination of in situ stress tensor at the proposed underground pump house of PRLIS, Pkg.1 | Irrigation & CAD Dept. Govt of Telangana |
05 | Determination of Insitu stress tensor at the proposed underground surge pool-pump house of J.Chokka Rao Devadula lift irrigation scheme Phase-3, Package-3, Telangana | MEIL |
S.No | Title | Client |
---|---|---|
01 | Design and stability evaluation of proposed deepening of mine wokings (from -47 to -66)includingh the surface dumps stability at Redi iron ore mine of Gogte Minerals.Sindhudurg District,Maharastra | Gogte Minerals |
02 | Strata Control and Monitoring Plan (SCAMP) for Kurja Mine, HASDEO Area, SECL., | SECL |
03 | Srata Control and Monitoring Plan (SCAMP) for Rajnagar R.O Mine, HASDEO Area, SECL | SECL |
04 | Scientific Studies for the optimization of bench paraeters and recommendation for the final pit slope stability of a S M Block iron ore mine M/s. M. Hanumantha Rao at Narayanpur village, Sandur taluk, Bellary district, Karnataka | M/s. Hanumnatha Rao |
05 | Geological mapping at multiple levels in different segments between 14th level to 4th level of the mine for determining geotechnical parameters to evaluate the feasibility of HW lode mining of TMPL Mine, UCIL, AP | UCIL |
06 | Scientific Study for design of ultimate pit slope and recommendation for stability of pit benches of Dharmapura, Karnataka | VNK MENON |
07 | Scientific studies for final dump slope stability with suitable Bench Parameters for Narrain Iron Mine ,Chitradurga,Karnataka | Vedanta Ltd. |
08 | Scientific Study on stability of South Side ( in-corp) high wall benches at MOCP, RG - I Area of SCCL, Peddapalli District, Telangana State | SCCL |
S.No | Title | Client |
---|---|---|
01 | Deformation monitoring of U/G powerhouse cavern of SardarSarovar project (2017-18) | SSNNL |
02 | Geological study and assessment of suitable measures for the safety and stability of the belum caves , Kolimigundla mandal, Kurnool, Dist. Andhra pradesh | APTDC |
03 | Analysis of Instrumentation data of Desilting Chamber, power house complex,surge shaft,TRT outfall area and Dam at NJHPS. | SJVNL |
04 | Third Party review of Numerical Analysis of Main Tunnel for Larsen & Toubro Ltd.. | L & T Ltd. |
05 | Analysis of Instrumentation data of Powerhouce Complex and Desilting Chamber ( April 1 2018 to March 31, 2019) at Tala Hydroelectric Project, Bhutan | DGPC Ltd., Bhutan |
06 | Rerun of 3D Numerical Analysis of Tehri Pumped Storage Scheme with change in geotechnical parameters | HCC Ltd. |
07 | Failure Analysis of CP-03A Stope and Evaluation of Extraction Sequence of Different Stopes in C-Block at Sindesar Khurd Mines, HZL, Rajasthan | HZL |
08 | 3D Numerical Modelling of Shafts for Pumphouse and Surge Pool of J. Chokka Rao Devadula Lift Irrigation Scheme (JCRDLIS), Package-III, Telangana | MEIL |
09 | Scientific studies for Bicharpur coal mine to finalise the pillar size to achieve ZERO subsidence using NEW method. | Ultra Tech cement Ltd. |
S.No | Title | Client |
---|---|---|
01 | Monitoring of Ground vibration and air overpressure due to blasting carried out for construction of Hydro-Technical Structure of unit 3 and 4 at Kudankulam Nuclear Power Plant,Kudankulam,L&T,Tamil Nadu | L&T KKNPP Phase 2 - HTS Package |
02 | To ascertain the feasibility of blasting for mining operations around Kumaraswamy Temple,Hospet,Department of Mines and Geology,Karnataka | Dept. of Mines & Geology of Gov. of Karnataka |
03 | Monitoring of blast induced vibration at two identified locations (Phase-III), Darlipalli Super Thermal Power Project (DSTPP), Stage-I (2×800 MW), NTPC Limited, Odisha - Extension-IV | NTPC, DSTPP, Odisha |
04 | Review and endorsement of blast design patterns for excavation of underground man tunnel structures, LDP Project, Vizag, Andra Pradesh. | L&T, LDP Project, Visakhapatnam |
05 | Phase II Monitoring of ground vibration and air overpressure due to blasting carried out for construction of Hydro-Technical Structure of unit 3 and 4 at Kudankulam Nuclear Power Plant, Kudankulam, L&T, Tamil Nadu. | L & T Phase-2, HTS Package |
06 | Monitoring of Ground vibration and air overpressure to blasting carried out for sonstruction of unit 5 and 6 at Kundankulam Nuclear Power Plant, Kundankulam SRC Projects Private Limted, Tamil Nadu | SRC Projects Ltd., |
07 | Monitoring of blast induced vibration at two identified locations (Phase-III, Darlipalli super thermal power project (DSTPP), stage-1(2 x 800), NTPC Ltd. Odisha, Extension-V | NTPC Ltd. |
08 | To ascertain the feasibility of mining by blasting at the proposed Nayanapalli Limestone mine and its probable impact of ground vibration on Belum Caves, Kolimigundla Mandal, Kurnool, Andra Pradesh | Ramco Cements Ltd., |
09 | Monitoring of ground vibration and air overpressure due to blasting carried out for construction of Hydro-Technical Structure of unit 3 and 4 at Kudankulam Nuclear Power Plant, Kudankulam, L&T, Tamil Nadu. | L&T, KKNNP,P-2,HTS Package |
10 | Phese II-Extn 1-Monitoring of Ground vibration and air overpressure to blasting carried out for sonstruction of unit 5 and 6 at Kundankulam Nuclear Power Plant, Kundankulam SRC Projects Private Limted, Tamil Nadu | SRC Projects Ltd., |
S.No | Title | Client |
---|---|---|
01 | NDE of vital components of winders / winches at RampuraAgucha Mines, HZL ( main shaft - kibble winders) | SSML |
02 | Rope testing(proof load test and NDT) of OCSL plant equipment at BIOM ,Bacheli complex | NMDC Ltd. |
03 | NDT on vital parts of the winders at Khetri & Kolihan mines,HCL | HCL |
04 | NDT on winch vital components and wire rope tests. | Palani Temple Trust |
05 | NDT on vital components of winders at Zawar group of mines | HZL |
06 | NDT on vital components of winders at RA Mines | HZL |
07 | NDT on vital parts of the winders at Khetri&Kolihanmines,HCL | HCL |
08 | NDT on vital components of winders at Zawar group of mines | HZL |
09 | NDT on Cable belt drine wire ropes at NALCO, damonjodi Odisha,visit 1of 6 | NALCO |
10 | Prototype/Proof load tests on hoist attachments of M/s.SSML | SSML |
11 | NDT on which (Winch vital components, car attachments, Axial shafts & Main Rope Attachments). | ADST Palani |
12 | NDT on vital components of RD Mines ,HZL. | HZL |
13 | Testing of core samples for Hutti, UTI and Hirabuddinni Gold Mines | HGML |
14 | Lab. Geotechnical investigations on core samples of Dr. B. R. A.Pranahita-Chevella LIS-Package-11,MEIL,Hyderabad | MEIL |
15 | Laboratory Geotechnical investigations on rock core samples from Geleki area of Asam Asset, Sivasagar | ONGC |
16 | Laboratory Geotechnical investigations on rock core samples from Geleki area of Asam Asset, Sivasagar | ONGC |
17 | Laboratory Geotechnical investigations on rock core samples from Borehole NBH 6A/1,13,14,15,31,39,40&45, L&T Construction, P1 Project, Vizag, Andhra Pradesh | L&T Vizag |
18 | Deformation of rock joint properties for input to 3D numerical modelling of power house complex,PHPA-II,Bhutan | PHPA-II, Bhutan |
S.No | Title | Client |
---|---|---|
01 | Construction stage engineering geological mapping of pond floors of natural draft cooling towers (ndct) foundation of Rajasthan atomic power project (RAPP) units 7&8, Rawatbhata in ChittorgarhDisrict of Rajasthan. | Gammon India Ltd. |
02 | Construction stage engineering geological foundation mapping of Yargol Garvity type concrete dam in Bangarpet taluk of Karnataka. | RIL,Yargol |
03 | Engineering Geological investigations of Kaleshwarm DBRAPCSS-II Lift irrigation Scheme Package-6, Karimnagar Distriact, Telengana State. | NECL |
04 | Engineering Geological investigations of Kaleshwarm DBRAPCSS-II Lift irrigation Scheme Package-6, Karimnagar Distriact, Telengana State. | NECL |
05 | Engineering Geological Foundation mapping of surge pool and pump house and geological investigations for draft tubes of kaleshwaram lift Irrigation projects package-10 siddipet district Telangana state | HCC-MEIL-BHEL |
06 | Short training Course on Rock Mass Classification Usingh the Q-System (NMT) for Sigareni Collieries Company Limited,Telangana State. | SCCL |
07 | Engineering Geological investigations of Palamuru Ranga Reddy Lift irrigation Scheme Package-5&8, Nagarkurnool Distriact, Telengana State. | Irrigation of CAD Dept. Govt. of Tengana State |
08 | Engineering Geological Foundation mapping of surge pool and pump house cavities and geological investigations for deliver main shafts(horizantal & Vertical) and Ventilation shafts of Kaleshwaram LIS-p11 | HCC-MEIL-BHEL(JV) |
S.No | Title | Client |
---|---|---|
01 | Geophysical survey to ascertain the risk subsidence around HMRB oil pipe line (Ch 257.700 to 257.800) | IOCL, Howrah |
02 | Seismic refraction survey at the proposed Silahalla dam site Kundah,Nilgiri,TN | TANGEDCO Ltd. |
03 | Geophysical survey at Vadnagar site of ASI, Gujarat | IIT Mumbai |
04 | Seismic and GPR survey for investigating road caving at Village Hosakerehalli,Bangalore | PHP Ltd. |
05 | Geophysics investigation for vibration Induced instability to evaluate safety atambazari dam to due to construction of metro viaduct for reach-3 | MMRCL |
06 | Geophysical survey for Mapping Sub-surface Strata at JCRDLIS Phase-III,Package-3,T.S. | MEIL |
07 | Geophysical Survey for mapping hard rock profile at the Construction site of Karle Infra Pvt.Ltd. | Karle InfrPvt.Ltd. |
S.No | Title | Client |
---|---|---|
01 | Determination of in-situ stress parameters at Hutti Gold Mine for the design of stopes below 20th level | HGML |
02 | Determination of In-situ Shear parameters at proposed dam across Markendaya river at Yargol,Bangarpet taluk of Karnataka. | RIL,Yargol |
03 | Determination of In-situ modulus of deformation of rock mass at the delivery main tunnels of Dr.B.R. Ambedkar Pranahita- Chevella Lift Irrigation scheme (P-11), Karimnagar Distriact, Telengana State. | MEIL |
04 | Determination of In-situ stress tensor at the proposed underground power house cavern of Naitware-Mori H. E. Project. | SJVNL |
05 | Determination of various In-situ rock mass parameters at the proposed Desilting chamber and power house site of Goriganga-IIIA, H. E. Project. | NHPC Ltd. |
06 | Determination of In-situ stress parameters at the proposed underground suge poo;/Pump house of PalamuruRengareddy lift-III pumping station | I&CAD Dept. Gov. of Telangana |
07 | Determination of In-situ stress parameters at the proposed underground suge poo;/Pump house of PalamuruRengareddy lift-II pumping station | I&CAD Dept. Gov. of Telangana |
08 | Determination of safe bearing capacity by plate load & foot load tests at pothead yard of punatsangchhu-II H E Projects | WAPCOS Ltd, Bhutan |
09 | Determination of In-situ Stress tensor at the proposed underground pump house of PRLIS, Pkg.16. | I&CAD Dept. Gov. of Telangana |
S.No | Title | Client |
---|---|---|
01 | Slope stability studiesof Corila Gaichem Paul Irone Mine Sigao and Collem village,South ,Goa | SDFI Pvt.Ltd. |
02 | The cost of Instruments installed at 5E HW panel at UCIL, | UCIL |
03 | Evaluation of pillar factor of safety for the proposed mining method with long panels at Tummalapalle Uranium Mine.A.P | UCIL |
04 | Scientific studies for pit stability monitoring toward North side of final pit slope stability upto 120m depth working of Krishna lime stone mine in Ramayanpatti village, Tirunelveli District. N. | Krishna Mines |
05 | Slope stability studies to Deepening the quarry and enhancing the dump-3 height of kaliapani chromite mine, kaliapani, Jajpur Dist. Odisha. | Balasore Alloys Ltd |
06 | Scientific studies to optimize the bench parameters and design of final pit slope stablity of k Deivendran Granites quarry in Veeriyampalayam Village | K Deivendran Granites quarry |
S.No | Title | Client |
---|---|---|
01 | Geothermal study at manappad and around Kudankulam Area , TN | NPCIL |
02 | Microseismic monitoring for 2nd year at TVHPP Tapovan-Vishanughat Project | NTPC Ltd. |
03 | Stability monitoring of power hose cavern of Tala hydro power plant using microseismic (1st year out of 3 years) | DGPCL, Bhutan |
04 | Seismotectonic evaluation (Feasibility study) of proposed Gugulapalli site , Nellore, A.P. | DGPCL, Bhutan |
S.No | Title | Client |
---|---|---|
01 | Geodetic monitoring of SardarSarovar Dam. (SSNNL) | SSNNL |
02 | 3D Stress Analysis of underground powerhouse complex at Mangdechu Hydroelectric Project, Bhutan. | MHPA, Bhutan |
03 | Deformation monitoring of U/G powerhouse cavern of SardarSarovar project | SSNNL |
04 | Geotechnical instrumentation and monitoring at Kaleswaram project (P-11), MEIL | MEIL |
05 | Analysis of instrumentation data of dam, desilting chamber ,surge shaft, powerhouse Complex and TRT out fall area at NJHPS | SJVNL |
06 | Analysis of Instrumentation data assistance in installation & monitoring of instrumentations at C#3 package of Punatsangchhu-II hydroelectric project, Bhutan | PHPA-II, Bhutan |
07 | 3D Numerical Model studies for stress analysis of underground power house complex & Underground surge shaft of Naitwar-Mori Hydroelectric project,Uttrakhand | SJVNL |
08 | Stability analysis of Butterfly Valve Chamber(BVC),using 3D Numerical Model at Mangdechhu H.E. Project, Bhutan | MHPA, Bhutan |
09 | Technical assessment of Underground Mining Method at RampuraAgucha U/G Mines, HZL | HZL |
10 | Scientific Studies to Assess the Feasibility of Underhand Mining Method at Rampura Agucha Underground Mines, HZL | HZL |
11 | Scientific Studies to Assess Stability of Drives through Paste fill at Rampura Agucha Underground Mines, HZL | HZL |
12 | Design of ground supports below -233 mRL up to-533 mRL at RampuraAgucha U/G Mines, HZL | HZL |
13 | Scientific Studies to design Geotechnical Instrumentation & Monitoring at RampuraAgucha U/G Mines, HZL | HZL |
14 | Audit of ground control Management plan of Rampura Agucha U/G Mines, HZL | HZL |
15 | Assessment of global stability and feasibility on account of mining the crown and rib pillars of mined out stopes in Zawar group of Mines,HZl | HZL |
16 | Analysis of Instrumentation data of Power House Complex and Desilting Chamber(April1,2017 to March 31.2018) at Tala Hydroelectric project , Bhutan | DGPCL, Bhutan |
S.No | Title | Client |
---|---|---|
01 | Monitoring of blast induced vibration at two identified locations (Phase-III, Darlipalli super thermal power project (DSTPP), stage-1(2 x 800), NTPC Ltd. Odisha, Extension-II | NTPC Ltd. |
02 | Blast design for armour rock to construct break water for Gopalpur port - Orissa, Afcons Infrastructure ltd | Afcons Infrastructure Ltd |
03 | Controlled blast design for excavation of Hydro-technical structure and ground vibration measurement near operating units 1and 2 of kudankulam nuclear power plant kudankulam, Tamil Nadu. | L&T KKNPP Phase 2 - HTS Package |
04 | Technical guidance for construction of tunnel from cable tunnel to reach Downstrem Surge Chamber and remaining in Tail Race Tunnels, Punatsangchhu II(1200 MW) Hydroelectric Project, Gurgoan | WAPCOS Ltd Bhutan |
05 | Monitoring of blast induced vibration at two identified locations (phase-III), Daripalli super thermal power project (DSTPP), Stage-I (2*800 MVV), NTPC Ltd, Odisha - Extension-III | NTPC Ltd |
06 | Ground vibration and air overpressure studies at Zuari limestone mine, Zuari cement ltd, Yerraguntla, YSR Dist. Andhra Pradesh | Zuari Cement Ltd. |
07 | To Technically guidance for rock excavation by controlled blasting at karle Town Center Project,Bangalore | Karle Infra Project,Bangalore |
08 | Technical guidance for rock excavation by controlled blasting at Kalyani Vista 2 Project, JP Nagar, Kalyani Developers, Bangalore. | Kalyani Developers |
09 | Controlled blast design for the excavation of structures of Unit 5 & 6 and ground vibration measurement near operating Units 1 & 2 of KKNPP, Kudankulam, SRC Projects Private Limited, Tamil Nadu | SRC Projects Private Ltd. |
10 | Ground vibration and air overpressure studies at M/s.KNR constructions Ltd., quarry, Modigolam Village, Irala Mandal, Chittoor Dist., Andra Pradesh | KNR Const.Ltd. |