Publications
Library
RTI
Tenders
e-Portal
Employee Section
Webmaster
Client Login
User Login
Contact Us
A+
A-
×
Client LogIn
Username
*
Password
*
×
User LogIn
Username
*
Password
*
हिन्दी
Home
History of NIRM
About NIRM
About NIRM
About Ministry of Mines
Our Vision and Mission
Quality Policy & Objectives
Organizational Chart
Governing Body
Peer Review Committee
Our Directors
Major Facilities
Current Events
Areas of activities
Underground Mines
Areas of involvement
Work highlights
Clientele
Opencast Mines
Areas of involvement
Work highlights
Clientele
Hydroelectric Projects
Areas of involvement
Work highlights
Clientele
Nuclear Power Projects
Areas of involvement
Work highlights
Clientele
Infrastructures Projects
Areas of involvement
Work highlights
Clientele
Tunneling
Areas of involvement
Work highlights
Clientele
Testing Services
Areas of involvement
Work highlights
Clientele
Training & Seminars
Generic training
Client specific areas
Research support
Project activities
On-going Projects
Completed Projects
Departments
Engineering Geology
Area of activities
Facilities
Manpower
Engineering Geophysics
Area of activities
Facilities
Manpower
Engineering Seismology
Area of activities
Facilities
Manpower
Geotechnical Engineering
Area of activities
Facilities
Manpower
Numerical Modeling
Area of activities
Facilities
Manpower
Geomechanics & Ground Control
Area of activities
Facilities
Manpower
Rock Blasting & Excavation Engineering
Area of activities
Facilities
Manpower
Testing Services
Area of activities
Facilities
Manpower
Seismotectonics
Area of activities
Facilities
Manpower
Administration & Finance
Major Groups
Registration Details
Manpower
Project Monitoring Cell
Activities
Facilities
Manpower
Contact Us
Announcements
Activities
News
Cancellation of Advt.
Training Progammes
Tender Notice
Contract Employment
Technical Info
NIRM Academics
Work Highlights
You Are In:
Home
/
Work Highlights
Hydroelectric Projects
3D discontinuum Model of twin caverns with shear and fractured zone
Maximum Principal Stress distribution after complete excavation of a cavern
Minimum Principal Stress distribution after complete excavation of cavern
Geodetic Monitoring of the Dam
Direct Shear Test at a site in Hydroelectric Project
Plate Load Test in a Hydroelectric Project
Hydraulic Fracture Test in a Hydroelectric Project
Hydraulic Fracture Test in a Hydroelectric Project
The direction of maximum compression at various projects in Dibang valley
Mapped microseismic events around power house cavern in 3D view
Displacement contours computed from the data recorded during first year monitoring
DPR stage geological investigations for Bunakha hydroelectric project, Bhutan
Geological investigations of the MalshejGhat HEP reservoir rim area,Maharashtra
Microseismic signal due to cracking in the rockmass as recorded by five sensor stations at a hydroelectric project
Geological investigations of the MalshejGhat lower dam HEP catchment area, Maharashtra
Identification of re bole during geological investigations of the MalshejGhat upper dam HEP site, Maharashtra
Planning for the subsurface exploration during DPR stage of MalshejGhat upper dam HEP site, Maharashtra
Resistivity imaging section for HRT, Kumaradhara HEP, Karnataka
Seismic Tomography across river, Teesta Stage-III, Sikkim
Seismic Tomography across river at dam axis, Bunakha Hydel, Bhutan
Seismic refraction section for Upper Demwe Project (Detection of fault was later confirmed by drilling)
Seismic refraction section for Upper Demwe Project (Detection of fault was later confirmed by drilling)
P-Wave velocity tomogram below Koteshwar Dam
Seismic Velocity Section at a Dam Site